HDPE CONDUIT VIDEOS

ABOUT THIS VIDEO LIBRARY:

PPI has developed this video channel as a service to the industry. The information presented here is offered in good faith and believed to be accurate, but is offered without any warranty, expressed or implied including WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Any reference to particular proprietary product should not be construed as an endorsement by PPI, which does not endorse the proprietary products or processes of any manufacturer. PPI assumes no responsibility for viewer's compliance with applicable laws and regulations.

Power & Communications Division

Loading video

A brief overview and introduction to the Power & Communications Division, one of the Divisions of the Plastics Pipe Institute (PPI).

CIC Side by Side Comparison

Loading video

Comparison of installation time for Cable In Conduit, PVC conduit and empty duct.

CIC Shipping and Handling

Loading video

Information for proper safe handling of Cable in Conduit reels including unreeling

CIC Preparation and Installation

Loading video

Positioning of the payoff reel and preparing Cable in Conduit for horizontal directional drilling

CIC Open Trench Installation

Loading video

Installing Cable in Conduit in an open trench

CIC Directional Boring

Loading video

Basic steps for installing Cable In Conduit using Directional Boring.